What comes with the PSS Poster Maker System?
A 24-inch poster printer, a preconfigured PC workstation with design and print software installed, ink for about 166 posters, delivery, installation and training, a 2-year on-site warranty, the Folio poster library, lifetime US-based phone support, lifetime web retraining and a school fundraising kit. The price is $4,599.
How much does a poster cost to print?
About $1.50 in paper and ink for a 24×36 poster. Counting the printer, workstation, warranty and supplies spread over the printer's 7-year life, the all-in cost is about $4.39 per poster at 660 posters a year. Print shops typically charge $20 or more for the same poster.
How many posters does a school need to print to break even?
Compared with paying about $20 per poster at a print shop, the Every-Wall Plan pays for itself at about 145 posters a year with its cost spread over the printer's life, or about 295 posters on a Year 1 cash basis.
How long does it take to get set up?
Usually 4 to 5 days from your order to a working printer. Installation takes about 40 minutes and most staff are printing confidently after about 20 minutes of training.
Is there a 36-inch poster maker?
The standard PSS system is 24 inches wide, which covers 24×36 posters and long banners because the roll length is effectively unlimited. A 36-inch model is available on request.
Can we pay with a purchase order or grant funds?
Yes. PSS invoices on standard district purchase orders. Schools commonly use Title I, Title III and PTO funds, and every package includes a fundraising kit.
What does the warranty cover?
The PSS Poster Maker System and the Every-Wall Plan include a 2-year on-site warranty. LITE includes a 1-year on-site warranty. All packages include lifetime US-based phone support.
What is the difference between the System and the Every-Wall Plan?
Both include the same printer, workstation and support. The Every-Wall Plan adds unlimited paper and ink for one year for $5,899, and renews at $2,399 a year, so the school has one predictable cost instead of supply orders through the year.